Our Work
We have in business since 1973 operating on one simple principle: provide each client with high-quality service. As a result we’ve enjoyed a reputation as one of the UK’s premier commercial landscape companies.
![](https://afan-group.com/wp-content/uploads/2019/07/UWE-Bristol-4-900x300.jpg)
![](https://afan-group.com/wp-content/uploads/2024/01/3e8a76c7-a2a9-4566-9adf-50d31a12a0d4-e1706696865224-1135x750.jpg)
Swansea Arena Abertawe
World-class design defines the buildings, parks and structures of the new Copr Bay district in Swansea. South Wales' newest multi-purpose entertainment and events space, Swansea Arena is a brand-new landmark 3,500 capacity indoor arena in the heart of Copr Bay, and a first for the city.
See More![](https://afan-group.com/wp-content/uploads/2022/07/AfanGroup-SwanseaArena-10_1.jpg)
BBC Wales Building, Cardiff
The roof garden is a striking feature of the Foster + Partners designed building. A curved opening in the metal roof plane allows natural light into the garden, which offers views across the city and provides a stunning location for outdoor filming. Commissioned, installed and planted by Afan Landscapes.
See More![](https://afan-group.com/wp-content/uploads/2020/01/BBC-cms-5-987x654w.jpg)
Fry Building – University of Bristol
The Fry Building is a Grade II listed building in the heart of Bristol University’s Clifton Campus. In 2012 it was agreed that the building would be repurposed and transformed into a world-class facility. Afan Landscapes were appointed to carry out the external landscaping upgrade.
See More![](https://afan-group.com/wp-content/uploads/2020/04/file1-e1586173228881.jpeg)
Bells Field Recreational Park, Coleford
The Bells Field project is a transformation of an old grammar school field into a new all activity park for the residents of Coleford. Afan Landscapes were appointed as Principal Contractor to carry out the construction and long term aftercare of the scheme.
See More![](https://afan-group.com/wp-content/uploads/2019/07/IMG_1576.jpg)
Green Heart – University of Birmingham
This striking new parkland in the centre of the University of Birmingham’s historic campus was completed in January 2019. It provides a unique space for performances, socialising, meeting and studying, while opening up views across the whole campus, as envisaged in the 1920s.
See More![](https://afan-group.com/wp-content/uploads/2020/04/geograph-6248164-by-Paul-Collins.jpg)